Part 8 Proposal - Pedestrian & Cycle Bridges over the Royal Canal at North Wall Quay

Printer-friendly version

Dublin City Council is proposing to provide two lightweight steel bridges over the mouth of the Royal Canal into the Liffey, one bridge for pedestrians and the other for cyclists, both 12m long.  The bridge closest to the Liffey will cater for pedestrians, connecting the existing pathway on the Campshires across the mouth of the Canal.  The cycleway bridge will be closer to the Scherzer Bridges, and will integrate with the current cycle arrangement through some ground work around the bridge. The works will require repaving and some works on both sides, to address level changes, moving electrical control boxes associated with the Scherzer Bridges, and removal of a number of trees to the west of the bridges to allow for a safe guided approach onto the bridges to segregate cyclist and pedestrians. 

For more information, please find below the documents included as part of this submission:
•    Cover Letter
•    Planning Report
•    Conservation Report
•    Appropriate Assessment Screening
•    Full page of newspaper notice
•    Copy of Site Notice
•    Relevant Plans/Drawings
      o    Site Location Map (Scale 1:1000) – Position of Site Notice/s must be clearly indicated on the Site Location Map
      o    Site Layout Plan (Scale 1:500), site to be clearly delineated in red.  Site Layout Plan to indicate boundary of site and buildings, roads, etc.
      o    Relevant Floor Plans/Elevations/Sections (Scale 1:100) or agreed scale
•    Photo Montages

Plans and Particulars of the proposed development may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy for a period of 4 weeks from Monday 24th September 2018 during public opening hours at the offices of Dublin City Council, Public Counter, Planning and Property Development Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8, Monday – Friday 09.00hrs to 16.30hrs.

A submission or observation in relation to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made, in writing, to the Executive Manager, Planning and Property Development  Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8, before 16.30hrs on Tuesday 6th November 2018.


 

Share this page: